How are metal buildings delivered and unloaded?
If jobsite delivery is requested, the building will usually be delivered to the jobsite on 2 or more trucks depending on the size of the building and options selected. Example: 1 truck of components, 1 truck of frames , and 1 truck for insulation. Alternatively, Central States will deliver directly to your distributor who will arrange your pick-up/delivery options.
For jobsite deliveries, Central States does not provide unloading of the materials and typically we do not have the material handling equipment on board to offer unloading. Customers requesting jobsite delivery should be prepared with their own material handling equipment on site to unload and erect the building. Your equipment should be able to handle at least 3,500 pounds.